COMPLETED PROJECTS

Construction of New Bridge Work at Telok Blangah

Owner:
Harbourfront Six Pte Ltd

Project Information
The length of the Pedestrian Overhead Bridge is around 113m long and it consists 4 beams. Out of which, the longest span is about 36.3m. The challenges of this project is to carry out the construction of bridge works just below Telok Blangah Viaduct, The overall total construction period of the bridge is about 6 months.

Bridge Works at Simei Ave, Upper Changi Road –Proposed ITE

Owner:
Institute of Technical Education

Project Information
The length of the Pedestrian Overhead Bridge is around 40m with 2 beams. The construction period including the piling works is about 5 months. The Bridge Design consist of having roof finishes and cladding that wrapped around the PSPC beam (as shown in the photos).

Relocation and modification the PSPC Beam for POB at Pasir Panjang Road infront Haw Par Villa for C855 MRT Circle Line stage 4 Project

Owner:
Land Transport Authority

Project Information
The PSPC beam of this new Pedestrian Overhead Bridge is recycled from an existing bridge at Pasir Panjang. After cutting away the over length and modifications to the existing beam, the beam is being launched to the new location, forming the new overhead bridge. From removal of existing bridge beam to modification to relocation of the overhead bridge, the entire process used a total span of 4 months only.

Design and Construction of New Overhead Bridge Across TPE Near Pasir RIs Blk 762 and Ikea / Courts

Owner:
Land Transport Authority

Project Information
The length of this Pedestrian Overhead Bridge is around 80m long across TPE , linking Pasir Ris to IKEA Tampines, consisting of 4 beams. The contract period for the project is about 11 months starting from August 2008 to June 2009.

Construction of 1 no of Pedestrian Overhead Bridge at Buona Vista Station for C855 MRT Circle Line Project

Owner:
Land Transport Authority

Project Information
The 40m pedestrian overhead bridge lies in the center of MRT tracks at Buona Vista MRT Station. The challenging portion of this project is to launch the 2 PSPC beams within the site constraints of the MRT tracks.

Proposed Pedestrian Overhead Bridge across Tampines Expressway near Punggol & Sengkang

Owner:
Land Transport Authority.

Project Information
The construction schedule of this 40m Pedestrian Overhead Bridge with a ramp of approximate length of 150m across TPE, linking Sengkang New Town and Punggol New Town, is done within 12 months including the design period.

Construction of Pedestrian Overhead Bridge and covered linkway across Central Expressway near Ang Mo Kio Block 476 to Serangoon Garden Estate

Owner:
Land Transport Authority.

Project Information
This project consist of a 2 span Pedestrian Overhead Bridge (approximately 50m), 185m of ramps, 85m of linkway and 2 motorcycle shelters. This bridge is completed within a span of 10 months, from design to opening it to public use.

Construction of Pedestrian Overhead Bridge, Bus Shelter & Covered Linkway from Woodlands MRT Station to Republic Polytechnic

Owner:
Republic Polytechnic


Project Information
The length of the Pedestrian Overhead Bridge is around 35m with 2 beams. The construction period is about 6 months. The design consists of having aluminum cladding around the bridge, linkway and bus shelters giving it a very futuristic look.